Spectrum of the Seas is one step closer to completion. Having undergone a unique construction process, Spectrum’s FERU (Floating Engine Room Unit) mega-block which was built in Rostock, Germany travelled 296 nautical miles down the River Ems to the Meyer Werft shipyard in Papenburg, Germany to be joined with the rest of the ship, which is scheduled for delivery in 2019.
20 Mar 2018